The Steel Bridge is coated with lead paint on the inside which is extremely dangerous
You MUST:
- Follow the Lead Decontamination Process
 - Change into clean overalls (supplied) in the change room
 - Remove contaminated overalls in the change room only (at meal breaks and at the end of shift)
 - Wash face and hands before each break
 - No eating inside the bridge
 - No smoking except in designated areas
 - Drink containers must be discarded after each single drink (recapping and reuse not allowed)
 - Blood tests as required to check lead levels
 - Any workers working inside the steel section must identify mitigation in SWMS risk assessment
 
